Widening & Strengthning of Pedana-Nuzvid- Vissannapet road (PNV-08),Krishna Dist.

Project Description

Client:

APRDC (Under Ramky Infrastructure Ltd., Hyderabad)

Project Cost:

Rs. 165.00 Crores

Salient Features:

  • Total Road Length: 52 km
  • Scope of Work: Comprehensive road widening and strengthening to enhance transportation efficiency and safety.
  • Location: Pedana-Nuzvid-Vissannapet, Krishna District

 

The Widening & Strengthening of Pedana-Nuzvid-Vissannapet Road (PNV-08) is a critical infrastructure project undertaken to improve the connectivity and transportation efficiency in the Krishna District. The project, commissioned by APRDC under the expertise of Ramky Infrastructure Ltd., Hyderabad, aims to upgrade a 52 km stretch of road with a significant investment of Rs. 165.00 Crores.

The primary focus of the project is on the comprehensive widening and strengthening of the existing road infrastructure. This includes expanding the road to accommodate higher traffic volumes and reinforcing the pavement to ensure durability and safety. The enhancements are expected to significantly reduce travel time, improve the movement of goods and services, and contribute to the economic development of the region.

With meticulous planning and execution, the project will transform the Pedana-Nuzvid-Vissannapet corridor into a modern, reliable roadway that meets current and future transportation needs.