Design, Build, and Construction of Storm Water Drainage System with 15 MLD Sewerage Treatment Plant in Madhubani Town, Bihar

Client: Bihar Urban Infrastructure Development Corporation Limited (BUIDCo)

Project Cost: ₹115.00 Crores

Project Overview: The Bihar Urban Infrastructure Development Corporation Limited (BUIDCo) is embarking on a transformative project to address the stormwater drainage challenges and wastewater management needs of Madhubani Town in Bihar. With a total project cost of ₹115.00 Crores, this initiative involves the design, construction, and operation & maintenance (O&M) of a comprehensive stormwater drainage system and a state-of-the-art 15 Million Litres per Day (MLD) Sewerage Treatment Plant (STP) for the town.

Project Components:

  1. Storm Water Drainage System Design and Construction:
    • Designing and building an efficient stormwater drainage network to mitigate the risk of flooding and waterlogging during heavy rainfall events.
    • Installation of stormwater drains, culverts, and other necessary infrastructure to ensure proper collection and discharge of rainwater.
  2. 15 MLD Sewerage Treatment Plant:
    • Construction of a Sewerage Treatment Plant with a capacity of 15 MLD to treat wastewater collected from Madhubani Town.
    • Implementation of advanced treatment processes to ensure the treated effluent meets environmental standards before discharge.
  3. Operation & Maintenance (O&M) Services:
    • Provision of O&M services for the entire stormwater drainage system and the Sewerage Treatment Plant for a period of 10 years.
    • Regular inspection, cleaning, and maintenance activities to ensure the optimal functioning and longevity of the infrastructure.

Project Objectives:

  • Alleviate the risk of flooding and waterlogging in Madhubani Town by implementing an efficient stormwater drainage system.
  • Improve the quality of life for residents by addressing wastewater management issues and ensuring proper treatment of sewage.
  • Enhance environmental sustainability through the implementation of advanced treatment technologies for wastewater.
  • Ensure the long-term viability and functionality of the infrastructure through comprehensive O&M services.

This project represents a significant investment in the infrastructure and overall development of Madhubani Town, aimed at improving resilience to climate-related challenges, enhancing public health, and promoting sustainable urban growth. BUIDCo is committed to delivering a high-quality and sustainable stormwater drainage system and Sewerage Treatment Plant that meets the needs of the community while safeguarding the environment for future generations.